Vertexa Technologies
Halving claims cycle time for a regional insurer

Halving claims cycle time for a regional insurer

Meridian Financial Group

Reduction in claims cycle time
56% Reduction in claims cycle time
From start to full migration
8 months From start to full migration
Cutover incidents
0 Cutover incidents
Annual operating saving
£2.1m Annual operating saving

Replacing a failing claims platform in eight months, in increments the business could verify as they landed.

The challenge

Meridian had spent two years and a substantial budget on a claims platform replacement that had not reached production. The programme had been structured as a single cutover, so nothing was demonstrable until everything was finished.

Meanwhile the legacy system was constraining the business: average claim cycle time was 14 days against a market benchmark of 6, and every new product required bespoke engineering.

What we did

We began with a three-week discovery that focused on why the previous programme had stalled rather than on requirements gathering. The core finding was structural: no capability could be released independently, so nothing could be validated.

We restructured delivery around the strangler pattern, routing claims through a facade and migrating one claim type at a time, with reconciliation between old and new running continuously.

The first claim type went live in week nine. The last legacy path was retired in month eight.

The result

Average cycle time fell from 14 days to 6.2. New product configuration moved from an engineering task measured in weeks to a configuration task measured in hours.

Because migration was incremental, no cutover weekend was required and no claim was processed twice.

More client work

  • Regional failover proven, not assumed

    Everline Insurance

    Regional failover proven, not assumed

    A disaster recovery programme that ended with a full, unannounced regional failover exercise.

    Actual failover time
    11 min Actual failover time
    Recovery time objective
    30 min Recovery time objective
  • Procurement approvals reduced from days to hours

    Vantage Manufacturing

    Procurement approvals reduced from days to hours

    Risk-based routing that removed three quarters of approval events without weakening a single control.

    Approval events
    -74% Approval events
    Average approval time
    4.5d → 6h Average approval time
  • A clinical data warehouse clinicians actually trust

    Solace Health

    A clinical data warehouse clinicians actually trust

    Six months on data quality and lineage before a single dashboard — and the reason adoption stuck.

    Clinical staff adoption
    78% Clinical staff adoption
    Board pack preparation
    9 days → 0 Board pack preparation
Chat on WhatsApp