Vertexa Technologies
Real-time fleet visibility across 2,400 vehicles

Real-time fleet visibility across 2,400 vehicles

Northbridge Logistics

Deviation detection latency
90s Deviation detection latency
On-time delivery improvement
+11pp On-time delivery improvement
Vehicles instrumented
2,400 Vehicles instrumented
Telematics vendors unified
3 Telematics vendors unified

An event-driven platform replacing overnight batch reporting with live operational visibility.

The challenge

Northbridge planned their operation from a report produced overnight. By the time a delay appeared in the data, the opportunity to act on it had passed by up to eighteen hours.

Telematics data existed but was locked inside three separate vendor portals with no common vehicle identity.

What we did

We built an ingestion layer that normalised feeds from all three telematics providers into a single event stream, with vehicle identity resolved against the fleet management system.

On top of that we delivered live operational dashboards and an exception engine that alerts planners to deviations while they can still be recovered.

The result

Planners now see a deviation within ninety seconds. On-time delivery improved by 11 percentage points in the first quarter after launch.

The normalisation layer also removed the vendor lock-in that had blocked a telematics retendering exercise for three years.

More client work

  • Regional failover proven, not assumed

    Everline Insurance

    Regional failover proven, not assumed

    A disaster recovery programme that ended with a full, unannounced regional failover exercise.

    Actual failover time
    11 min Actual failover time
    Recovery time objective
    30 min Recovery time objective
  • Procurement approvals reduced from days to hours

    Vantage Manufacturing

    Procurement approvals reduced from days to hours

    Risk-based routing that removed three quarters of approval events without weakening a single control.

    Approval events
    -74% Approval events
    Average approval time
    4.5d → 6h Average approval time
  • A clinical data warehouse clinicians actually trust

    Solace Health

    A clinical data warehouse clinicians actually trust

    Six months on data quality and lineage before a single dashboard — and the reason adoption stuck.

    Clinical staff adoption
    78% Clinical staff adoption
    Board pack preparation
    9 days → 0 Board pack preparation
Chat on WhatsApp